Residential Multi-Unit Development
Client Need: Tight timeline bid on 10-unit residential development with total project footprint of 12000 SF
What We Delivered:
Structural lumber takeoff (2x8 joists, 2x6 studs, exterior sheathing)
Complete material breakdown across 8 trades
Preliminary cost estimate: ~$1.6 M construction cost
Result: Contractor bid within 2.3% of final actual costs. Completed analysis in 6 hours vs. 18 hours internal estimate.
Commercial Office Renovation
Client Need: Fast feasibility estimate for 5300 SF office area per floor
What We Delivered:
Drywall/framing quantities across 3 floors ( Gypsum boards, Metal studs 360S162-54 , 600S162-54 and tracks 360T162-54 and 600T162-54 )
Mechanical and electrical coordination review (identified 4 clashes)
Cost estimate: ~$960,000 renovation package for the whole project scope
Result: Clash report saved contractor from ~$75K in change orders during construction.
Timber Frame Project
Client Need:
Tight timeline bid on 16-unit residential development
CNC fabrication codes for custom wood structure
What We Delivered:
Structural lumber takeoff (2x8 joists, 2x6 studs, exterior sheathing)
Complete material breakdown across 8 trades
Full CNC code set
Nesting optimization for material efficiency
3D render for client presentation
Result:
Contractor bid within 2.3% of final actual costs. Completed analysis in 8 hours vs. 18 hours internal estimate.
12% material waste reduction. Fabrication completed 3 days ahead of schedule.